Tvareet
AI-Accelerated Cloud Migration

Migrate Smarter. Scale Faster.
Zero Downtime. 100% Confidence.

We move your workloads, databases, and applications to AWS, Azure, or GCP using AI-driven assessment tools that eliminate risk, reduce cloud costs by up to 45%, and ensure business continuity from day one.

Multi-Cloud Expertise
Zero Downtime Migration
Enterprise-Grade Security
300+

Cloud Migrations Completed

45%

Average Cloud Cost Reduction

99.99%

Uptime SLA Achieved

0

Data Loss Incidents

Trusted by Industry Leaders

KFC
KPMG
Google
Domino's
Boston Consulting Group
Americana
KFC
KPMG
Google
Domino's
Boston Consulting Group
Americana

End-to-End Cloud Migration Services

From assessment and planning through execution and post-migration optimization — we own every phase of your cloud journey.

Lift & Shift Migration

Rapidly move existing workloads to AWS, Azure, or GCP as-is with minimal re-architecture. Ideal for quick wins and immediate cost savings.

Re-Platform & Modernization

Optimize applications during migration — containerize with Docker/Kubernetes, adopt managed services, and eliminate technical debt.

Database Migration

Zero-data-loss migration of Oracle, SQL Server, MySQL, and MongoDB to cloud-native managed databases with automated schema conversion.

Data Center to Cloud

End-to-end DC exit strategy — server assessment, dependency mapping, phased migration waves, and decommission planning.

Multi-Cloud & Hybrid Strategy

Design resilient multi-cloud architectures across AWS + Azure + GCP that avoid vendor lock-in and optimize cost-performance ratio.

Cloud Security & Compliance

Implement IAM, encryption at rest/in-transit, VPC design, and compliance frameworks (SOC2, HIPAA, GDPR, ISO 27001) during migration.

AI That Plans, Migrates
& Optimizes Your Cloud

Traditional migration is slow and risky. Our AI-first approach replaces months of manual dependency mapping with hours of intelligent automation — with predictive risk scoring at every step.

AI Migration Assessment

Our proprietary AI engine scans your infrastructure, maps 10,000+ dependencies, identifies risks, and generates a prioritized migration wave plan — in hours, not weeks.

FinOps & Cost Intelligence

ML-based cloud cost prediction models analyze your usage patterns and auto-recommend right-sizing, reserved instances, and spot usage to cut bills by 30–45%.

Intelligent Anomaly Detection

Post-migration AI monitors deployed workloads 24/7, detects performance anomalies, predicts resource bottlenecks, and auto-scales before issues impact users.

AI-Driven Runbook Automation

LLM-generated infrastructure-as-code (Terraform/CDK), automated testing pipelines, and self-healing runbooks that reduce human error to near-zero.

AI Assessment Engine — Running
Workloads Scanned847 / 847
Dependencies Mapped12,481
Risk ScoreLOW — 8/100
✓ Recommended: 6 Migration Waves | Est. Savings: $184K/yr

Built for Enterprise Scale from Day One

Every migration we execute is engineered for reliability, security, and long-term cost efficiency.

Zero Downtime Migrations

Blue-green deployments, traffic shifting, and parallel-run strategies for business continuity.

Enterprise Security

SOC2, HIPAA, GDPR & ISO 27001 compliant migrations with end-to-end encryption.

Real-time Cost Monitoring

CloudHealth & AWS Cost Explorer dashboards keeping spend in check from day one.

Multi-Region Resilience

Active-active and active-passive DR architectures across 30+ global cloud regions.

IaC & GitOps Delivery

Terraform, AWS CDK, and Helm charts for repeatable, auditable infrastructure deployment.

Powered by
Cloud-Native Technology

We leverage best-in-class tools and proven frameworks to make your cloud migration fast, secure, and cost-efficient.

Cloud Platforms

Certified expertise across all three hyperscaler platforms.

AWS
Microsoft Azure
Google Cloud
Oracle Cloud

Why Leading Enterprises
Trust Tvareet with Their Cloud

AWS, Azure & GCP Certified Engineers

Our team holds 50+ active cloud certifications across all three hyperscalers — not generalist consultants, but deep cloud specialists.

AI-Powered Migration Assessment

We replace weeks of manual dependency mapping with hours of AI-driven analysis, giving you a precise migration plan before the project starts.

Fixed-Price, Milestone-Based Delivery

You pay per milestone, not per hour. Our fixed-scope contracts eliminate budget risk and put accountability squarely on us.

Guaranteed Zero Data Loss

Our validated migration runbooks and parallel-run testing protocols have maintained a 0% data loss record across 300+ migrations.

Post-Migration FinOps Optimization

We stay engaged for 90 days post-launch to right-size your cloud, eliminate waste, and ensure cost savings match our projections.

"Tvareet migrated our 200-server data center to AWS in just 14 weeks — on time, on budget, and with zero downtime. Our cloud bill dropped 38% in month one."
Siddharth R.
CTO — Enterprise SaaS Platform

Our Work Speaks
For Itself

Explore how we've transformed businesses with cutting-edge technology and design-led engineering.

Healthcare Automation

Nagalikar Diagnostic

A fully automated diagnostic center management system integrating Beckman Coulter & Siemens analyzers directly with the cloud. Reduced report turnaround time by 60% and achieved zero manual errors.

150+
Daily Patients
0%
Error Rate
3x
Efficiency
View Case Study
Nagalikar Diagnostic
EdTech Platform

Physics Factor

A comprehensive learning ecosystem with 10,000+ students. Features real-time assessments, analytics, and interactive video lectures. Built to handle high concurrency with 99.9% uptime.

10k+
Students
95%
Engagement
99.9%
Uptime
View Case Study
Physics Factor
E-commerce & Customization

Printila

A custom merchandise platform with a powerful real-time product designer. Streamlined vendor management and order processing, boosting operational efficiency by 50%.

+50%
Efficiency
Fast
Processing
Premium
User Exp
View Case Study
Printila

Our Proven Migration Process

A structured, risk-managed methodology refined across 300+ enterprise cloud migrations.

Phase 01

Discovery & Portfolio Assessment

AI-driven inventory of all servers, VMs, databases, and applications. Dependency mapping, TCO analysis, and cloud readiness scoring across your entire estate.

Phase 02

Migration Strategy & Wave Planning

Define migration patterns (Lift & Shift, Re-platform, Re-architect) per workload. Build prioritized waves, set KPIs, and establish rollback protocols.

Phase 03

Landing Zone & Foundation

Deploy AWS Control Tower, Azure Landing Zone, or GCP Organization with security baselines, networking (VPCs, DNS, VPN/Direct Connect), and IAM governance.

Phase 04

Phased Migration Execution

Execute migration waves using automated tooling. Parallel-run validation, performance benchmarking, and stakeholder sign-off at each wave gate.

Phase 05

Cutover & Go-Live

Traffic cut-over with blue-green strategy, final smoke testing, war-room support during cutover window, and real-time observability dashboards.

Phase 06

FinOps & Optimization

90-day post-migration optimization: right-sizing, Reserved Instance purchasing, spot fleet configuration, and cloud governance to sustain 30–45% cost reduction.

Client Success Stories

"The automation system significantly reduced our report turnaround time. The direct integration with our analyzers meant zero manual errors and happier patients."

Dr. Anand Nagalikar

Director, Nagalikar Diagnostic Center

"The scalable ecosystem Tvareet built allowed us to handle thousands of concurrent students without a single glitch. Their understanding of EdTech is profound."

Satyam Kumar

Founder, Physics Factor

"The operational efficiency we gained with Tvareet's platform is unmatched. We cut down manual work by half and can now scale confidently."

Pravin Kumar

Founder, Printila

Ready to Move to the Cloud?

Book a free 60-minute assessment with our certified cloud architects.

Phone

Frequently Asked Questions

Everything leadership and IT teams ask before committing to a cloud migration.

Timeline depends on workload complexity. A small web application can migrate in 2–4 weeks. A mid-market enterprise (50–200 servers) typically takes 3–5 months. A full data center exit (500+ servers) runs 6–12 months using phased waves. Our AI assessment gives you a precise timeline estimate in the first week.